Engineers met in a series of meetings today to discuss inspection and repair options for space shuttle Discovery’s ground umbilical carrier plate (GUCP) and a crack in the external fuel tank foam insulation. Discovery's launch was postponed Friday until at least Nov. 30 because of a hydrogen gas leak at the GUCP. Technicians at NASA’s Kennedy Space Center in Florida have been measuring the alignment of the plate on the external tank and performing leak checks. Crews expect to begin disconnecting the GUCP Tuesday afternoon after disconnecting the hydrogen vent line that attaches to the GUCP. Managers will assess repair options after the disconnected GUCP is inspected
“It has become appallingly obvious that our technology has exceeded our humanity.” Albert Einstein
No comments:
Post a Comment